Single Family Home

Single-Family-Home.jpeg

For new single family homes, Design Review and a Building Permit is required. The application will start with review by the Bureau of Planning.

Faster Approval for Housing Projects!
Get faster approval for your project. We've created a new Ministerial Design Review process to approve housing projects based on clear Objective Design Standards. See if your project qualifies below!

Before you Start

Please review the Permit Requirements below as these vary from project to project.

Ready to get started?  First, make sure you are registered and activated at our Online Permit Center. For instructions, please visit our Planning & Building Video Tutorials webpage.

Permit Requirements

When Are Permits Required?

Design Review (either Objective or Regular) is required for the construction of one (1) new primary dwelling unit (i.e., a Single Family House), other than an Accessory Dwelling Unit (ADU). The project must obtain Design Review approval from the Bureau of Planning prior to submitting the required Building Permit application. The Building Permit for a new single-family house includes all related Mechanical, Electrical or Plumbing (MEP) work within the building, and must be obtained before any construction work begins. Separate Mechanical, Electrical or Plumbing (MEP) permits for the project are not required.

Please note that separate permits will also be required from the Oakland Department of Transportation, Oakland Fire Department, and Oakland Public Works depending on the scope of the project.

Who Can Apply?

  1. Contractors who are licensed by the State of California with a classification appropriate for the work that will be performed and have a current Business Tax Certificate.
  2. Owners of a building or their legal representative.

Objective Design Standards and Faster Review for 1 to 4 Family Housing Projects

The following 1 to 4 family housing and mixed-use projects are now eligible for faster "Ministerial" Design Review using Objective Design Standards!

  • Single-Family Homes, Duplexes, Triplexes, and Fourplexes
  • Townhomes and other 1-4 unit housing projects
  • Additions or conversions to an existing building that alter the exterior building envelope to create new dwelling units. If a project creates additional units that are entirely within an existing building, the project will go through Small Project Design Review instead (see Planning Code Section 17.136.030).

Additional Requirements: All applications for Design Review involving the creation of one or more new dwelling units with a project area footprint slope that exceeds 20% shall use an architect licensed by the State of California. In addition, for Ministerial Design Review projects of 1-4 units, you are not required to give notice of intention to apply for Ministerial Design Review to nearby properties.

IMPORTANT NOTE: To be eligible for faster Ministerial Design Review, your project must NOT require a Conditional Use Permit (CUP), variance, Planned Unit Development (PUD), or Development Agreement. Otherwise, your project must go through Regular (Discretionary) Design Review. In addition, your project must not fall into one of the project categories listed in 17.136.038.A.5 that are not eligible for Ministerial Design Review.

For details, see the Applicability section in the 1 to 4 Family or Mixed-Use Project Objective Design Standards Guide and Checklist(PDF, 2MB). For guidance on applying for your project, see below.

 

How to Apply

Step 1.Step One: Design Review

Step 2.Step Two: Building Permits

  • Once advised by staff, submit a Building Worksheet through our Online Permit Center*
    * NOTE: You will be taken to our login page first before you can submit a Building Worksheet
  • In the Worksheet, upload all required documents as outlined in the Submittal Checklist for New Construction(PDF, 94KB) and a description of all Mechanical, Electrical or Plumbing (MEP) work to be performed
  • Once we receive your Building Worksheet and associated documents, staff will review your submission for completeness.
  • Once advised by staff, your permit application will be created and fees will be assessed
  • Pay your fees
  • Once fees are paid, your application will be routed for Plan Check review

Step 3.Step Three: Recycling Plan

  • All Oakland building permits require an approved Recycling Plan (called a WRRP) before being issued. As soon as your Permit Application has been processed, a Green Halo project will be created for you and an invitation for the project will be sent to the email address you provided on your Permit Application.
  • Follow the directions in Green Halo to pay this fee and write a Recycling Plan for all debris your building project will generate.

Learn More About Recycling

Step 4.Step Four: Work Out Utilities

  • Single Family Homes will need a sewer lateral permit to connect sewage service to the unit. For more information email DOTOnlinePermits@oaklandca.gov. A Curb, Gutter, Sidewalk Permit may also be required.
  • Depending on whether the home appliances are vented appliances, you may also need a separate gas meter for the ADU.
    Refer to the City's General Building Code Requirements checklist to verify and log on to PG&E's online customer service portal to apply for new electric and/or gas service.

Step 5.Step Five: Final Check & Permits

  • After Plan Check has been completed, your application will go to Final Check before the permit is issued.
  • Staff will with work with you to ensure everything is complete and inform you of any outstanding steps, fees, or documents.
  • Permits are issued

For the latest processing estimates, please see our Average Permit Processing Turnaround Times webpage.

Need to Know

Questions?

Call (510) 238-3911 or find quick answers through our Permit & Services Questions Portal. You may also schedule an appointment with Permit Counter staff during open hours.