Thank you, Oakland, for your patience and preparedness during the PG&E power shutdown. We are interested in your feedback so that we can better prepare for the future. Take this brief survey.

Technical Bulletins - Mandatory Soft Story Retrofit

Engineering Technical Bulletins

View

Date Posted: May 21st, 2019 @ 8:57 AM
Last Updated: May 21st, 2019 @ 12:48 PM