Jack London Aquatic Center - Rowing Dock Replacement Project

Funded by Measure HH

Status:
Completed
Start date:
Mar 3, 2020
Completion date:
Jun 30, 2021

About

The existing wooden rowing dock is approximately 26'x130' and has been in need of a replacement for some time. A new pre-fabricated floating dock of similar size will be installed so that both the public and rowing clubs can continue to have access at the Jack London Aquatic Center. Construction is scheduled to begin in April 2021.

Gallery

Map

Map of Project: Jack London Aquatic Center - Rowing Dock Replacement Project

Timeline

Planning
2019
Design
2020
Construction
Spring 2021