Oakland Army Base Redevelopment Project

About

This page will have the compiled Oakland Army Based Project's information.

Project Updates

No updates, yet! Check back soon!

Project Documents

Oakland Army Base November Agenda

Excavation Requirements for Oakland Army Base

2000 Oakland Army Base Redevelopment Plan

Oakland Army Base Project Map with Sub-Areas

2002 Oakland Army Base Reuse Plan

Redevelopment Plan for Oakland Army Base Project

Community Jobs Oversight Commission - Oakland Army Base

Architectural Salvage Assessment: Contributing Buildings, Oakland Army Base Historic District, Oakland, California (2006)

Feasibility Study for Adaptive Reuse of the Existing Oakland Army Base Warehouses (2012)

Operational Air Quality Plan (for All Prologis Warehouses at the Oakland Army Base) - DRAFT (3/26/18)

Public Engagement Plan for Development at the Former Oakland Army Base

Feasibility Study of Adative Reuse for Auto Dealership Activities: East Gateway Subarea, Oakland Army Base (2006)

Initial Study/Addendum (entire document)

Summary of the 2012 OARB Initial Study/Addendum

Operational Air Quality Plan for Good Eggs Fulfillment Center at Oakland Army Base FINAL and APPROVED (9/23/19)

Item 01 - Case File PLN19158 at 2008 Wake Avenue in D3 re: Recycling Facility on a vacant parcel at the former Oakland Army Base

City Administrator Approval of Air Quality Operational Plan PODS 55-75 Adm Toney Way (5/15/18)

Operational Air Quality Plan for PODS, 55-75 Adm. Toney Way FINAL & APPROVED (5/9/18)

Appendix K: Draft Technical Memo: Traffic Analysis for Detour – 7th Street Grade Separation

Appendix B: Transportation and Traffic Outputs

SCA/MMRP (10/15/12 - SUPERSEDED)

ADOPTED SCA/MMRP (7/16/13)

Appendix L: Feasibility Study for Adaptive Reuse of the Existing OARB Warehouses

Southeast and Central Gateway Air Quality Plan for Construction (Prologis) - DRAFT (08/03/17)

Appendix J: 2012 Mitigation Monitoring and Reporting Program Roadmap

Appendix H: First Addendum to the Supplemental EIR for the OARB Automall Project

Appendix G: Supplemental Environmental Impact Report for the OARB Automall Project

Appendix I: 2002 Mitigation Monitoring and Reporting Program

Appendix F: 2002 Final Environmental Impact Report

Appendix E: 2002 Draft Environmental Impact Report

Appendix D: Tidelands Trust Exchange Agreement Materials

Appendix C: Water Supply Assessment Correspondence

Northeast Gateway Air Quality Plan for Construction (Prologis) - FINAL & APPROVED (8/30/16)

City Administrator Approval of Northeast Gateway Air Quality Plan for Construction (Prologis) (10/4/16)

City Administrator Approval of Southeast and Central Gateway Air Quality Plan for Construction (Prologis) (11/30/17)

Northeast Gateway Air Quality Plan for Construction (Prologis) - DRAFT (4/25/16)

Construction-Related Air Quality Measures ("Air Quality Plan") - FINAL & APPROVED (11/11/13)

City Administrator Approval of Construction-Related Air Quality Measures ("Air Quality Plan") (12/5/13)

Construction-Related Air Quality Measures ("Air Quality Plan") - DRAFT (5/8/13)

Appendix A: Air Quality and Greenhouse Gas Emissions Model Outputs

Draft EIR - April 2002

Draft EIR Appendix-April 2002

Draft EIR Traffic Supplemental- April 2002

Final EIR-July 2002

Initial Study/Addendum for the Central Gateway Aggregate Recycling and Fill Project (2009)

Diesel Emission Reduction and Air Quality Plan for Operations of the ConGlobal Container Depot and Repair Site (Prologis) - DRAFT (3/26/18)

Southeast and Central Gateway Air Quality Plan for Construction (Prologis) - FINAL & APPROVED (10/16/17)

Item #1 - Staff Report - Case File PLN19158 at 2308 Maritime St/2008 Wake Ave for construction of recycling facility at the former Oakland Army Base

Operational Air Quality Plan for ConGlobal, 11 Burma Road FINAL and APPROVED (12/17/18)

Meeting Agenda and supporting documents - CJOC

OAB Community Jobs Oversight Commission - Agenda

CJOC Meeting Agenda for February 21, 2019

Community Jobs Oversight Commission (CJOC) Meeting

Community Jobs Oversight Commission Meeting Agenda and Minutes

Gateway Industrial District General Plan & Zoning Map

Appendix D: Enforcement of Parking Regulations and Truck Routes Technical Memorandum

Appendix H: Strategy Development Process

Appendix E: Truck Background Technical Memorandum

Appendices to the West Oakland Truck Management Plan

City Administrator Approval of the West Oakland Truck Management Plan, April 25, 2019

Appendix F: Public Engagement Process

Appendix A : Truck Parking Technical Memorandum

Appendix C: Signs and Communication Technical Memorandum

West Oakland Truck Management Plan May 2019

Draft West Oakland Truck Management Plan Public Comment Period: November 16, 2018 to January 4, 2019

Appendix B: Truck Movement and Safety Technical Memorandum

Appendix G: Stakeholder Comments Spreadsheet

Public Workshop #5 Agenda for West Oakland Truck Management Plan

City Administrator Approval of Air Quality Operational Plan for ConGlobal, 11 Burma Road (12/17/18)

Truck Parking, West Oakland Truck Management Plan