Thank you, Oakland, for your patience and preparedness during the PG&E power shutdown. We are interested in your feedback so that we can better prepare for the future. Take this brief survey.

Item 09 - Case File PLN17089 at West Oakland BART in D3 re: Installation of a Wireless Telecommunication Facility

Publish Date: Jul, 16 2019