Thank you, Oakland, for your patience and preparedness during the PG&E power shutdown. We are interested in your feedback so that we can better prepare for the future. Take this brief survey.

Item 07 - Case File ER030004, DA13171, PUD13170-PUDF-03 at Jack London Square Site F3 in D3 re: Final Development Permits

Publish Date: Jul, 22 2019