Thank you, Oakland, for your patience and preparedness during the PG&E power shutdown. We are interested in your feedback so that we can better prepare for the future. Take this brief survey.

Item 04 - Case File PLN16072 at 280 W. MacArthur Blvd in D1 re: Demolish and Replace Existing Central Utility Plant

Publish Date: Jul, 26 2019