Info Memo - City Hall Fire Alarm Replacement

Published on Oct 10, 2016 | Info Memo

In April of 2015 the fire alarm system in City Hall failed during a scheduled inspection and testing. It was
determined after follow up assessment that the system was irreparable and needed to be replaced. The
total estimated cost and budget to replace the system was $550,000.

The entire project took 11 months to complete with the majority of the work being performed on nights
and weekends to minimize impacts to City business.