Thank you, Oakland, for your patience and preparedness during the PG&E power shutdown. We are interested in your feedback so that we can better prepare for the future. Take this brief survey.

Havenscourt Redesign Proposal

Publish Date: Oct, 17 2018

Download File

Presentation